Watertower - Kingston substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
AH2-028 Watertower - Kingston 69 kV 69 44 Hybrid Withdrawn
AH2-028A Watertower - Kingston 69 kV 69 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.