Beatty-Greene substation interconnection queue

2 active projects totalling 490.3 MW in the PJM queue.

2active projects
490.3active MW
2total filed
Queue IDProjectkVMWResourceStatus
AE2-148 Fox Squirrel Solar 345 397.3 Solar In Service
AF1-228 Springwater Solar 345 93 Solar Under Construction

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.