Maryland Offshore Wind Energy Project (MOWEP)

PJM queue ID AB1-056

Maryland Offshore Wind Energy Project (MOWEP) (AB1-056) is listed in the PJM interconnection queue as a 64.4 MW offshore wind project in Sussex County, DE. The filing names Indian River I as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2027.

Queue IDAB1-056
Project nameMaryland Offshore Wind Energy Project (MOWEP)
Status (as published)Suspended
SubstationIndian River I
Point of interconnectionIndian River 230kV I
CountySussex
StateDE
Voltage230 kV
Capacity64.4 MW
Resource (as published)Offshore Wind
Resource categoryOffshore Wind (normalized for filtering)
Target commercial operation2027-12-31
Source datasetserial

Same substation and county

Indian River I substation: 4 requests in the PJM queue, 2 active totaling 66.3 MW.

Queue IDProjectMWResourceStatus
AF1-007Maryland Offshore Wind Energy Project (MOWEP)1.9Offshore WindSuspended
AF2-193Indian River 230 kV I119Offshore WindWithdrawn
AH1-634Indian River 230kV I17.7WindWithdrawn

Sussex, DE: 70 requests in the PJM queue, 7 active totaling 196.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy247.8
MW capacity64.4
MFO247.8

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.