Maryland Offshore Wind Energy Project (MOWEP)
PJM queue ID AF1-007
Maryland Offshore Wind Energy Project (MOWEP) (AF1-007) is listed in the PJM interconnection queue as a 1.9 MW offshore wind project in Sussex County, DE. The filing names Indian River I as its point of interconnection. PJM lists its status as “Suspended”, with a target commercial operation date of December 31, 2027.
| Queue ID | AF1-007 |
|---|---|
| Project name | Maryland Offshore Wind Energy Project (MOWEP) |
| Status (as published) | Suspended |
| Substation | Indian River I |
| Point of interconnection | Indian River 230 kV I |
| County | Sussex |
| State | DE |
| Voltage | 230 kV |
| Capacity | 1.9 MW |
| Resource (as published) | Offshore Wind |
| Resource category | Offshore Wind (normalized for filtering) |
| Target commercial operation | 2027-12-31 |
| Source dataset | serial |
Same substation and county
Indian River I substation: 4 requests in the PJM queue, 2 active totaling 66.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AB1-056 | Maryland Offshore Wind Energy Project (MOWEP) | 64.4 | Offshore Wind | Suspended |
| AF2-193 | Indian River 230 kV I | 119 | Offshore Wind | Withdrawn |
| AH1-634 | Indian River 230kV I | 17.7 | Wind | Withdrawn |
Sussex, DE: 70 requests in the PJM queue, 7 active totaling 196.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 7.3 |
| MW capacity | 1.9 |
| MFO | 255.1 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.