Beacon Power Flywheel Station (W1-111) is listed in the PJM interconnection queue as a battery request filed at 0 MW (a net change or energy-only filing) in Luzerne County, PA. The filing names Harwood-Berwick as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 1, 2014.

Queue IDW1-111
Project nameBeacon Power Flywheel Station
Status (as published)In Service
SubstationHarwood-Berwick
Point of interconnectionHarwood-Berwick 69kV
CountyLuzerne
StatePA
Voltage69 kV
Capacity0 MW (0 MW as filed — net change or energy-only)
Resource (as published)Storage
Resource categoryBattery (normalized for filtering)
Target commercial operation2014-06-01
Source datasetserial

Same substation and county

Harwood-Berwick substation: 2 requests in the PJM queue, 1 active totaling 0 MW.

Queue IDProjectMWResourceStatus
AC1-151Harwood-Berwick 69kV7.6SolarWithdrawn

Luzerne, PA: 83 requests in the PJM queue, 20 active totaling 8,384.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy20
MW capacity0
MFO20

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first