Chambersburg Energy, LLC (AD2-110) is listed in the PJM interconnection queue as a 12 MW gas project in Franklin County, PA. The filing names Guilford as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2022.

Queue IDAD2-110
Project nameChambersburg Energy, LLC
Status (as published)In Service
SubstationGuilford
Point of interconnectionGuilford 138kV
CountyFranklin
StatePA
Voltage138 kV
Capacity12 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2022-09-30
Source datasetserial

Same substation and county

Guilford substation: 8 requests in the PJM queue, 2 active totaling 100 MW.

Queue IDProjectMWResourceStatus
E04_W20Guilford 138 kV88GasIn Service
AF1-209FR Boyer Mill 29.5SolarWithdrawn
AG1-515Chambersburg Energy4BatteryWithdrawn
W2-095Guilford 34.5kV3.8SolarWithdrawn
X1-086Guilford 34.5kV3.7SolarWithdrawn
AF2-275FR-Social Island0HybridWithdrawn
AF2-276FR-Statler0HybridWithdrawn

Franklin, PA: 80 requests in the PJM queue, 20 active totaling 384.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy12
MW capacity12
MFO100

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first