Chambersburg Energy, LLC
PJM queue ID AD2-110
Chambersburg Energy, LLC (AD2-110) is listed in the PJM interconnection queue as a 12 MW gas project in Franklin County, PA. The filing names Guilford as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 30, 2022.
| Queue ID | AD2-110 |
|---|---|
| Project name | Chambersburg Energy, LLC |
| Status (as published) | In Service |
| Substation | Guilford |
| Point of interconnection | Guilford 138kV |
| County | Franklin |
| State | PA |
| Voltage | 138 kV |
| Capacity | 12 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2022-09-30 |
| Source dataset | serial |
Same substation and county
Guilford substation: 8 requests in the PJM queue, 2 active totaling 100 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| E04_W20 | Guilford 138 kV | 88 | Gas | In Service |
| AF1-209 | FR Boyer Mill 2 | 9.5 | Solar | Withdrawn |
| AG1-515 | Chambersburg Energy | 4 | Battery | Withdrawn |
| W2-095 | Guilford 34.5kV | 3.8 | Solar | Withdrawn |
| X1-086 | Guilford 34.5kV | 3.7 | Solar | Withdrawn |
| AF2-275 | FR-Social Island | 0 | Hybrid | Withdrawn |
| AF2-276 | FR-Statler | 0 | Hybrid | Withdrawn |
Franklin, PA: 80 requests in the PJM queue, 20 active totaling 384.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 12 |
| MW capacity | 12 |
| MFO | 100 |