Orchard Park Generating Station
PJM queue ID I12
Orchard Park Generating Station (I12) is listed in the PJM interconnection queue as a 23.3 MW project in Franklin County, PA. The filing names Grand Point as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of January 1, 2004.
| Queue ID | I12 |
|---|---|
| Project name | Orchard Park Generating Station |
| Status (as published) | In Service |
| Substation | Grand Point |
| Point of interconnection | Grand Point 69kV |
| County | Franklin |
| State | PA |
| Voltage | 69 kV |
| Capacity | 23.3 MW |
| Resource (as published) | Diesel |
| Resource category | Other (normalized for filtering) |
| Target commercial operation | 2004-01-01 |
| Source dataset | serial |
Same substation and county
Grand Point substation: 5 requests in the PJM queue, 1 active totaling 23.3 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| M06 | Grand Point | 30.5 | Other | Withdrawn |
| N30 | Grand Point 12kV | 5 | Gas | Withdrawn |
| W1-064 | Grand Point 12kV | 1.6 | Gas | Withdrawn |
| T192 | Grand Point 12kV | 0 | Hydro | Withdrawn |
Franklin, PA: 80 requests in the PJM queue, 20 active totaling 384.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 23.3 |
| MW capacity | 23.3 |
| MFO | 30.5 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.