Kane, IL interconnection queue

3 active projects totalling 295 MW in the PJM queue, plus 8 with terminal status (shown greyed).

3active projects
295active MW
11total filed
Queue IDProjectkVMWResourceStatus
C01-1335 West Rutland 138 kV 138 kV 138 250 Battery Active
AI1-156 West Rutland 138 kV 138 170 Battery Withdrawn
L13_CE25 City of Geneva Units 1-5 n/r 29 Gas In Service
AF1-072 Rocky Road n/r 17.2 Gas Withdrawn
T74 Elgin Energy Center n/r 16 Gas In Service
AE2-312 Rocky Road n/r 7 Gas Withdrawn
Q16 Western Ave 12kV 12 6.6 Gas Withdrawn
Q12 Fox River Heights 12kV 12 1.6 Gas Withdrawn
AB1-085 North Aurora n/r 0 Battery Withdrawn
AI2-006 Elgin 138kV 138 0 Battery Withdrawn
AI2-007 Rocky Road 138kV 138 0 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.