Burma - Armstrong substation interconnection queue
1 active project totaling 200 MW in the PJM queue, plus 1 with terminal status (shown grayed).
2 PJM queue filings name Burma - Armstrong as the point of interconnection, all in Clarion County, PA.
Target commercial operation dates as filed run from Apr 2028 to Sep 2031 (2 filings). 1 active filing targets a date after November 27, 2026.
Transmission owner as filed: APS (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| C01-1368 | Burma - Armstrong 138 kV | 138 | 200 | Battery | Active | Sep 2031 |
| AG2-429 | Gardenia | 138 | 46.5 | Hybrid | Withdrawn | Apr 2028 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AG2-429 | Terminal status | 46.5 | Active → Withdrawn |