Burma - Armstrong substation interconnection queue

1 active project totaling 200 MW in the PJM queue, plus 1 with terminal status (shown grayed).

2 PJM queue filings name Burma - Armstrong as the point of interconnection, all in Clarion County, PA.

Target commercial operation dates as filed run from Apr 2028 to Sep 2031 (2 filings). 1 active filing targets a date after November 27, 2026.

Transmission owner as filed: APS (2 filings).

1active projects
200active MW
2total filed
Queue IDProjectkVMWResourceStatusTarget COD
C01-1368 Burma - Armstrong 138 kV 138 200 Battery Active Sep 2031
AG2-429 Gardenia 138 46.5 Hybrid Withdrawn Apr 2028

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AG2-429Terminal status46.5 Active → Withdrawn

Other PJM queue substations in Clarion County, PA

All 25 PJM queue filings in Clarion County, PA.