Sligo substation interconnection queue

0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).

Target commercial operation dates as filed run from Oct 2017 to Dec 2029 (4 filings).

Transmission owner as filed: Dominion (1 filing).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatusTarget COD
AB2-081 Sligo 34.5kV 34.5 13 Solar Withdrawn Oct 2017
AH1-033 Sligo 34.5 kV 34.5 13 Solar Withdrawn Dec 2029
AB1-156 Sligo 34.5kV 34.5 7.6 Solar Withdrawn Oct 2017
AF2-273 CL-Route 58 R 25 0 Hybrid Withdrawn Sep 2022

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Tracked changes at this substation

1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.

DetectedQueue IDChangeMWStatus was → now
2026-10-05AH1-033Terminal status13 Active → Withdrawn

Other PJM queue substations in Camden County, NC

All 5 PJM queue filings in Camden County, NC.

Other PJM queue substations in Currituck County, NC

All 17 PJM queue filings in Currituck County, NC.

Other PJM queue substations in Clarion County, PA

All 25 PJM queue filings in Clarion County, PA.