Sligo substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 4 with terminal status (shown grayed).
Target commercial operation dates as filed run from Oct 2017 to Dec 2029 (4 filings).
Transmission owner as filed: Dominion (1 filing).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AB2-081 | Sligo 34.5kV | 34.5 | 13 | Solar | Withdrawn | Oct 2017 |
| AH1-033 | Sligo 34.5 kV | 34.5 | 13 | Solar | Withdrawn | Dec 2029 |
| AB1-156 | Sligo 34.5kV | 34.5 | 7.6 | Solar | Withdrawn | Oct 2017 |
| AF2-273 | CL-Route 58 R | 25 | 0 | Hybrid | Withdrawn | Sep 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Tracked changes at this substation
1 change to filings at this point of interconnection, observed between weekly snapshots of the PJM queue. For a capacity revision MW is the change, not the new total.
| Detected | Queue ID | Change | MW | Status was → now |
|---|---|---|---|---|
| 2026-10-05 | AH1-033 | Terminal status | 13 | Active → Withdrawn |
Other PJM queue substations in Camden County, NC
- Elizabeth City: 1 active, 13 MW of 2 filed
Other PJM queue substations in Currituck County, NC
- Shawboro-Sligo: 1 active, 98.6 MW of 4 filed
- Hickory-Shawboro: 1 active, 84 MW of 3 filed
- Hickory-Moyock: 2 active, 67.3 MW of 3 filed
- Moyock: 1 active, 56 MW of 2 filed
Other PJM queue substations in Clarion County, PA
- Burma - Armstrong: 1 active, 200 MW of 2 filed
- Emlenton: 1 active, 18 MW of 4 filed
- Erie East: none active of 6 filed
- Burma: none active of 2 filed
- Clarion: none active of 2 filed
- Wolfs Corners: none active of 2 filed