Clarion Boards

PJM queue ID AE1-123

Clarion Boards (AE1-123) is listed in the PJM interconnection queue as a 18 MW gas project in Clarion County, PA. The filing names Emlenton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 10, 2023.

Queue IDAE1-123
Project nameClarion Boards
Status (as published)In Service
SubstationEmlenton
Point of interconnectionEmlenton 34.5 kV
CountyClarion
StatePA
Voltage34.5 kV
Capacity18 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2023-11-10
Source datasetserial

Same substation and county

Emlenton substation: 4 requests in the PJM queue, 1 active totaling 18 MW.

Queue IDProjectMWResourceStatus
Z1-105Emlenton 34.5kV19.9GasWithdrawn
AC1-011Emlenton 34.5kV18GasWithdrawn
AF2-166Long Bridge12SolarWithdrawn

Clarion, PA: 25 requests in the PJM queue, 7 active totaling 320.2 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy18
MW capacity18
MFO18

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.