Clarion Boards
PJM queue ID AE1-123
Clarion Boards (AE1-123) is listed in the PJM interconnection queue as a 18 MW gas project in Clarion County, PA. The filing names Emlenton as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of November 10, 2023.
| Queue ID | AE1-123 |
|---|---|
| Project name | Clarion Boards |
| Status (as published) | In Service |
| Substation | Emlenton |
| Point of interconnection | Emlenton 34.5 kV |
| County | Clarion |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 18 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2023-11-10 |
| Source dataset | serial |
Same substation and county
Emlenton substation: 4 requests in the PJM queue, 1 active totaling 18 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| Z1-105 | Emlenton 34.5kV | 19.9 | Gas | Withdrawn |
| AC1-011 | Emlenton 34.5kV | 18 | Gas | Withdrawn |
| AF2-166 | Long Bridge | 12 | Solar | Withdrawn |
Clarion, PA: 25 requests in the PJM queue, 7 active totaling 320.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 18 |
| MW capacity | 18 |
| MFO | 18 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.