Wolfs Corners substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Wolfs Corners as the point of interconnection, all in Clarion County, PA.
Target commercial operation dates as filed run from Sep 2022 to Jan 2024 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AI2-059 | Wolfs Corners 34.5 kV | 34.5 | 7.3 | Solar | Withdrawn | Jan 2024 |
| AG1-138 | Wolfs Corners 34.5 kV | 34.5 | 4.8 | Solar | Withdrawn | Sep 2022 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Clarion County, PA