Derry substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Derry as the point of interconnection, all in Montour County, PA.
Target commercial operation dates as filed run from Dec 2021 to Feb 2023 (2 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-093 | Derry 12.47 kV | 12.5 | 1.8 | Solar | Withdrawn | Dec 2021 |
| AF2-290 | NO-Mexico | 12.5 | 0 | Hybrid | Withdrawn | Feb 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
PJM planning mentions
A substation with the same name is named in PJM transmission planning materials: Derry (PPL, 2 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Other PJM queue substations in Montour County, PA
- Montour: 2 active, 581 MW of 14 filed
- Susquehanna: 4 active, 68 MW of 13 filed
- Montour #1: 2 active, 16 MW of 2 filed
- Derry Tap-Derry Bus: 1 active, 8.4 MW of 2 filed
- Derry Tap-Derry Bus III: 1 active, 4.1 MW of 2 filed