Montour substation interconnection queue
2 active projects totalling 581 MW in the PJM queue, plus 12 with terminal status (shown greyed).
2active projects
581active MW
14total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1176 | Montour 230 kV | 230 | 574 | Gas | Active |
| AE2-271 | Montour Solar One | 230 | 61 | Solar | Withdrawn |
| AE1-224 | Montour 230 kV | 230 | 60 | Solar | Withdrawn |
| AF1-311 | Montour 230 kV | 230 | 57 | Solar | Withdrawn |
| AI2-475 | Montour 230 kV | 230 | 40.6 | Solar | Withdrawn |
| AI2-474 | Montour 230 kV | 230 | 34.8 | Solar | Withdrawn |
| AF2-331 | Montour 230 kV | 230 | 30 | Solar | Withdrawn |
| AF2-332 | Montour 230 kV | 230 | 30 | Solar | Withdrawn |
| AI2-471 | Montour 230 kV | 230 | 29.5 | Solar | Withdrawn |
| AI2-473 | Montour 230 kV | 230 | 29 | Solar | Withdrawn |
| AI2-472 | Montour 230 kV | 230 | 14.5 | Solar | Withdrawn |
| AF2-333 | Montour 230 kV | 230 | 12 | Solar | Withdrawn |
| AF2-334 | Montour 230 kV | 230 | 12 | Solar | Withdrawn |
| E07 | Montour #2 | 230 | 7 | Coal | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.