Montour, PA interconnection queue

5 active projects totalling 611 MW in the PJM queue, plus 18 with terminal status (shown greyed).

5active projects
611active MW
23total filed
Queue IDProjectkVMWResourceStatus
R01 Susquehanna n/r 800 Nuclear Withdrawn
C01-1176 Montour 230 kV 230 574 Gas Active
AE2-271 Montour Solar One 230 61 Solar Withdrawn
AE1-224 Montour 230 kV 230 60 Solar Withdrawn
AF1-311 Montour 230 kV 230 57 Solar Withdrawn
AI2-475 Montour 230 kV 230 40.6 Solar Withdrawn
AI2-474 Montour 230 kV 230 34.8 Solar Withdrawn
AF2-331 Montour 230 kV 230 30 Solar Withdrawn
AF2-332 Montour 230 kV 230 30 Solar Withdrawn
AI2-471 Montour 230 kV 230 29.5 Solar Withdrawn
AI2-473 Montour 230 kV 230 29 Solar Withdrawn
AH1-469 Derry Tap-Derry Bus 69 kV III 69 15 Hybrid Withdrawn
AI2-472 Montour 230 kV 230 14.5 Solar Withdrawn
A32 Montour #1 n/r 14 Coal In Service
A33 Montour #2 n/r 14 Coal In Service
AF2-333 Montour 230 kV 230 12 Solar Withdrawn
AF2-334 Montour 230 kV 230 12 Solar Withdrawn
AE2-084 Cottontail Solar 3 69 8.4 Solar Withdrawn
E07 Montour #2 230 7 Coal In Service
AG2-480 Derry Tap-Derry Bus 69 kV II 69 4.1 Solar Withdrawn
L09 Montour #1 230 2 Coal In Service
AF2-093 Derry 12.47 kV 12.5 1.8 Solar Withdrawn
AF2-290 NO-Mexico 12.5 0 Hybrid Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.