Blackwater Solar
PJM queue ID AE1-173
Blackwater Solar (AE1-173) is listed in the PJM interconnection queue as a 480 MW solar project in Sussex County, VA. The filing names Carson-Suffolk as its point of interconnection. PJM lists its status as “Under Construction”, with a target commercial operation date of October 1, 2030.
| Queue ID | AE1-173 |
|---|---|
| Project name | Blackwater Solar |
| Status (as published) | Under Construction |
| Substation | Carson-Suffolk |
| Point of interconnection | Carson-Suffolk 500 kV |
| County | Sussex |
| State | VA |
| Voltage | 500 kV |
| Capacity | 480 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2030-10-01 |
| Source dataset | serial |
Same substation and county
Carson-Suffolk substation: 4 requests in the PJM queue, 1 active totaling 480 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-178 | Carson-Suffolk 500 kV | 324.9 | Solar | Withdrawn |
| AH2-150 | Carson-Suffolk 500 kV | 320 | Battery | Withdrawn |
| AG1-184 | Carson-Suffolk 500 kV | 175.1 | Battery | Withdrawn |
Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 800 |
| MW capacity | 480 |
| MFO | 800 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.