Big Pine Solar

PJM queue ID AE2-051

Big Pine Solar (AE2-051) is listed in the PJM interconnection queue as a 90 MW solar project in Sussex County, VA. The filing names Carson-Septa as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of August 1, 2031.

Queue IDAE2-051
Project nameBig Pine Solar
Status (as published)Engineering and Procurement
SubstationCarson-Septa
Point of interconnectionCarson-Septa 500 kV
CountySussex
StateVA
Voltage500 kV
Capacity90 MW
Resource (as published)Solar
Resource categorySolar (normalized for filtering)
Target commercial operation2031-08-01
Source datasetserial

Same substation and county

Carson-Septa substation: 2 requests in the PJM queue, 1 active totaling 90 MW.

Queue IDProjectMWResourceStatus
AE2-311Carson-Septa 500 kV240SolarWithdrawn

Sussex, VA: 39 requests in the PJM queue, 14 active totaling 1,580.7 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy150
MW capacity90
MFO150

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.