Whitethorn Solar Project

ERCOT queue ID 29INR0263

Queue ID29INR0263
Project nameWhitethorn Solar Project
Status (as published)SS Completed, FIS Started, No IA
Substation860 GIRVINSW
Point of interconnection345KV 860 GIRVINSW
CountyPecos
StateTX
Voltage345 kV
Capacity163.1 MW
Resource (as published)SOL/PV
Resource categorySolar (normalised for filtering)
Target commercial operation2029-04-26
Source datasetlarge

Tracked changes

1 change observed between weekly snapshots of the ERCOT queue since ERCOT tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-10-05 New request 163.1 Not reported → SS Completed, FIS Started, No IA

Full change log →

Additional filed fields

Interconnecting EntityGreasewood III LLC
Cdr ZoneWEST
Fuel CodeSOL
Technology CodePV
Screening Study Complete46122
Water AvailabilityNot Required

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.