Frederick, MD interconnection queue

8 active projects totalling 923.1 MW in the PJM queue, plus 26 with terminal status (shown greyed).

8active projects
923.1active MW
34total filed
Queue IDProjectkVMWResourceStatus
G50 Dickerson 230kV 230 910 Gas Withdrawn
G00_W39 Doubs 500 kV or 230 kV 500 668 Gas Withdrawn
G51_W62 Catoctin CC 230 640 Gas Withdrawn
E05_W25 Doubs 500 kV or 230 kV 500 620 Gas Withdrawn
C01-1767 Doubs 230 kV 230 350 Battery Active
C01-1929 Mt Airy 230 kV 230 300 Battery Active
C01-1910 Stonewall 138 kV 138 150 Battery Active
C01-1478 Doubs 230 kV 230 140 Battery Withdrawn
C01-2012 Doubs 230 kV 230 100 Battery Active
V3-056 Metropolitan Court 34.5kV 34.5 50 Other Withdrawn
W3-070 Metropolitan Court 34.5kV 34.5 50 Other Withdrawn
Y2-096 Balenger Sewage-Thomas Bakery 34.5kV 34.5 47.2 Other Withdrawn
AC1-139 Doubs 230kV 230 38.8 Solar Withdrawn
AC2-178 Ortanna 138kV 138 38 Solar Withdrawn
AB2-129 Potomac Solar, LLC 230 30.4 Solar Withdrawn
AB2-181 Catoctin 138kV 138 14 Solar Withdrawn
AA2-145 Hessong Birdge Solar Facility 34.5 10.9 Solar Withdrawn
AA2-146 Catoctin 34.5kV 34.5 10.9 Solar Withdrawn
AC1-039 Catoctin Furnace Solar Facility 34 10.4 Solar Withdrawn
AH2-262 Catoctin-Carroll 138 kV 138 10.2 Hybrid Withdrawn
AB1-124 Legore Bridge Solar Center Facility 34.5 7.6 Solar In Service
AB1-066 Lime Kiln-Aqueduct 34.5kV 34.5 7.5 Solar Withdrawn
AB1-125 Biggs Ford Solar Facility 34.5 5.7 Solar In Service
AB1-098 Walkersville Solar Facility 12 5.4 Solar Withdrawn
W1-116 Mount St. Mary's PV Park 34 5.3 Solar In Service
AB2-144 Emmitsburg–Taneytown 2 34.5 kV 34.5 5.2 Solar Withdrawn
AA1-109 Frederick Road Solar 34.5 4.5 Solar In Service
Y3-029 Hickory Plains Hydroponics 34.5 4.4 Gas Withdrawn
O34 Frederick 12kV 12 3 Gas Withdrawn
AA2-143 Catoctin 12.5kV 12.5 2.7 Solar Withdrawn
AA2-153 Yellow Springs 34.5kV 34.5 2.7 Solar Withdrawn
U1-048 Reichs LF n/r 2 Gas Deactivated
Y2-075 Solar City n/r 0 Solar Withdrawn
Z1-053 Monocacy 12.47 KV - Worman Mill Feeder 12.5 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.