Cameron County: substations in ERCOT transmission project tracking
47 substation names the workbook places in Cameron County.
| Substation | Projects | Utilities | kV | HIFLD record |
|---|---|---|---|---|
| 5789 Southmost | 1 | BPUB | 138 | None |
| 59420 Filter Plant | 1 | BPUB | 138 | None |
| 59500 South Plant | 1 | BPUB | 138 | None |
| and Southmost (STEC) | 1 | BPUB | 138 | None |
| Annova LNG | 0 | STEC | 138 | None |
| Atlas (BPUB) | 1 | BPUB | 138 | None |
| Boca Chica | 2 | STEC | 138 | None |
| Bonilla | 1 | AEP TCC | 345 | None |
| Brownsville SW | 1 | AEP TCC | 69 | None |
| Burns | 2 | STEC | 138 | None |
| Candela | 0 | AEP TCC | 345 | None |
| Chalybe | 8 | AEP TCC, AEP TCC/AEP TCC/SLU, AEP TCC/SLU, SLU | 138, 345 | None |
| Ciruela | 1 | AEP TCC | 345 | None |
| East Rio Hondo | 1 | STEC | 138 | None |
| Endpoint | 2 | AEP TCC | 138 | None |
| Eneus | 1 | AEP TCC | 345 | None |
| Filter Plant (BPUB) | 1 | BPUB | 138 | None |
| Gulch | 1 | AEP TCC | 345 | None |
| Halcon | 1 | AEP TCC | 345 | None |
| Harligen SW | 1 | AEP TCC | 138 | None |
| Kelvin | 1 | AEP TCC | 345 | None |
| Kingfisher | 6 | AEP TCC/AEP TCC/SLU, AEP TCC/SLU, SLU | 345, 765 | None |
| La Palma | 4 | AEP TCC, AEP TCC/SLU | 138, 345 | None |
| LaPalma | 0 | AEP TCC | 345 | None |
| Luna | 1 | AEP TCC | 138 | None |
| Marconi | 0 | AEP TCC | 138 | None |
| Mesquite | 1 | AEP TCC | 138 | None |
| Military Highway | 1 | AEP TCC | 138 | Name and county agree |
| Mobile substation | 1 | BPUB | 138 | None |
| Ocelot | 1 | AEP TCC | 138 | None |
| Oleander | 1 | AEP TCC | 138 | None |
| Palmito | 2 | AEP TCC/AEP TCC/SLU, SLU | 345 | None |
| Palo Alto 5965 | 1 | BPUB/BROWNSVILLE PUB | 138 | None |
| Pompano | 1 | AEP TCC | 138 | None |
| Port Isabel | 1 | AEP TCC | 138 | None |
| Port South | 0 | STEC | 138 | None |
| PORTSOUTH | 4 | STEC | 138 | None |
| Rio Hondo | 4 | AEP TCC, STEC | 138, 345 | Name and county agree |
| Sharyland's Stillman | 1 | SLU | 138 | None |
| Skid | 1 | AEP TCC | 138 | None |
| South Padre Island | 1 | AEP TCC | 138 | None |
| South Plant (BPUB) | 1 | BPUB | 138 | None |
| Stewart Road | 2 | AEP TCC, SLU | 138, 345 | None |
| Stillman | 2 | AEP TCC, AEP TCC/SLU | 138 | None |
| Union Carbide | 1 | AEP TCC | 138 | None |
| Villa Cavazos | 1 | AEP TCC | 138 | None |
| Wren | 1 | AEP TCC | 345 | None |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.