Chalybe
Named in 8 listed projects in ERCOT’s transmission project tracking workbook, in Cameron County, plus 1 on its Cancelled tab. First named in the release with data as of June 1, 2024.
Described as new. The quoted wording calls this substation new. “new 345 kV Chalybe station” — project 93217 description, as the utility reported it
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Cameron, TX: ERCOT queue, 30 active of 32. Same county, not the same substation.
Location
25.9657, -97.3758 · Cameron County, TX · view on a map
Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±500 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.
How it was located: Symbol anchored: the green-ringed 345/138-kV substation circle labelled Chalybe on ERCOT's 25RPG039 Option 1 and Option 3 maps (April 2026 status update p.8 and p.10). Read off both maps with least-squares affine fits on OSM substations Waterport, Highway 511, Central Avenue, Military Highway, Palmito, La Palma 345 kV and East Rio Hondo (residuals 0.02-0.5 km): 25.9666,-97.3756 and 25.9651,-97.3758; mean taken. The point is 0.29 km from OSM 'Union Carbide Substation' (AEP, 138 kV, way 513362319, 25.96819,-97.37513), the station TPIT 76082 says is rebuilt as Chalybe. +/- ~500 m.
Note: ERCOT's November 2024 Board map for 24RPG008 (Figure 9.1, coarser, ~60 m/px, residuals up to ~1.3 km) draws the Chalybe new/convert symbol about 3 km further west (~25.975,-97.404) than the 2026 STEC maps do; the 2026 maps and TPIT 76082 (Union Carbide rebuilt as Chalybe) agree on the Union Carbide site, so that point is used. TPIT also calls it 'South Carbide (Chalybe)'. The Chalybe 345-kV load interconnection for the 'Delta' load (TPIT 81588) is on the Cancelled tab.
County: the Census county at this point.
Sources: ERCOT Independent Review status update, STEC Southeast Brownsville Large Load Transmission System Improvements Project (25RPG039), RPG meeting April 2026 (2026-04-09), p.8, p.10 · ERCOT Board item 6.1: Independent Review of AEPSC Brownsville Area Improvements Transmission Project (24RPG008) (2024-11-21), PDF p.44, Figure 9.1 Map of Option 2A · ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 76082, 93217, 98618, 98620, 98622, 98632, 98637, 104593, 104603; cancelled 81588 (release 2026-10) · OpenStreetMap: Union Carbide Substation (AEP) way 513362319 and Brownsville-area anchors (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Chalybe to Endpoint: Construct New 138 kV Double Circuit Line Construct a new 138 kV double circuit line from Chalybe to Endpoint ERCOT project 104593 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Jan 2030 | Chalybe to Endpoint Cameron County |
Chalybe, Endpoint |
| Chalybe: Expand 138 kV Station Install two (2) 138 kV breakers at the Chalybe 138 kV station ERCOT project 104603 |
AEP TCC Tier 4 |
Planned Future tab |
138 | Jan 2030 | Chalybe Cameron County |
Chalybe |
| Update Topology in Brownsville Area per Approved RPG Project Adding in 345 kV topology for LRGV Brownsville area (new 345 kV Chalybe station with two (2) 675 MVA autos being fed from Sharyland's Kingfisher and Palmito stations) per the BOD approved RPG project. Also added additional 138 kV feed from Stillman to AEP's Chalybe 138 kV ERCOT project 93217 · RPG 24RPG008 |
SLU Tier 1 |
Planned Future tab |
345 | May 2029 | Chalybe Cameron County |
Chalybe |
| Chalybe: Expand 345 kV Station Install two 345/138 kV autotransformers at the Chalybe 345/138 kV station ERCOT project 98618 · RPG 24RPG008 |
AEP TCC Tier 1 |
Planned Future tab |
345 | Oct 2028 | Chalybe Cameron County |
Chalybe |
| Chalybe to Kingfisher: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Chalybe to Kingfisher ERCOT project 98620 · utility no. TP2025010 · RPG 24RPG008 |
AEP TCC/AEP TCC/SLU Tier 1 |
Planned Future tab |
345 | Oct 2028 | Chalybe to Kingfisher Cameron County |
Chalybe, Kingfisher |
| Chalybe to Palmito: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Chalybe to Palmito ERCOT project 98622 · utility no. TP2025010 · RPG 24RPG008 |
AEP TCC/AEP TCC/SLU Tier 1 |
Planned Future tab |
345 | Oct 2028 | Chalybe to Palmito Cameron County |
Chalybe, Palmito |
| Chalybe: Install two STATCOMs at the 138 kV Station Install two 150 MVAR STATCOMs at the Chalybe 138 kV station ERCOT project 98632 · utility no. TP2025010 · RPG 24RPG008 |
AEP TCC Tier 1 |
Planned Future tab |
138 | Oct 2028 | Chalybe Cameron County |
Chalybe |
| Chalybe to Stillman: Construct New 138 kV Line Construct a new 138 kV single circuit line from Chalybe to Stillman ERCOT project 98637 · utility no. TP2025010 · RPG 24RPG008 |
AEP TCC/SLU Tier 1 |
Planned Future tab |
138 | Oct 2028 | Chalybe to Stillman Cameron County |
Chalybe, Stillman |
On the Cancelled tab
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Chalybe: Expand 345 kV Station Interconnect the Delta load to the Chalybe 345 kV station on the Chalybe to Kingfisher and Chalybe to Palmito 345 kV lines ERCOT project 81588 |
AEP TCC Tier 4 |
Conceptual Cancelled tab |
345 | Jun 2028 | Chalybe Cameron County |
Chalybe |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| June 1, 2026 | 104593 | First listed | on the Future tab |
| June 1, 2026 | 104603 | First listed | on the Future tab |
| June 1, 2026 | 98618 | Projected in-service date | Mar 2028 → Oct 2028 |
| June 1, 2026 | 98620 | Projected in-service date | Mar 2028 → Oct 2028 |
| June 1, 2026 | 98622 | Projected in-service date | Mar 2028 → Oct 2028 |
| June 1, 2026 | 98632 | Projected in-service date | Mar 2028 → Oct 2028 |
| June 1, 2026 | 98637 | Projected in-service date | Mar 2028 → Oct 2028 |
| October 1, 2025 | 81588 | Moved between tabs | Future → Cancelled |
| October 1, 2025 | 98618 | First listed | on the Future tab |
| October 1, 2025 | 98620 | First listed | on the Future tab |
| October 1, 2025 | 98622 | First listed | on the Future tab |
| October 1, 2025 | 98632 | First listed | on the Future tab |
| October 1, 2025 | 98637 | First listed | on the Future tab |
| June 1, 2025 | 93217 | First listed | on the Future tab |
| June 1, 2024 | 81588 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.