Wren

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Cameron County. First named in the release with data as of June 1, 2025.

Cameroncounty as printed
345kV
AEP TCCutility
1projects listed

Described as new. The quoted wording calls this substation new. “Wren: Construct New 345 kV Station” — project 104463 title, as the utility reported it

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Cameron, TX: ERCOT queue, 30 active of 32. Same county, not the same substation.

Location

Cameron County, TX

County only. A source prints the county; no point is published. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

Sources: ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 104463 (release 2026-10) · AEPSC Rio Grande Valley System Improvements (26RPG009) overview, RPG July 2026 (2026-07-20), p.4-7 · OpenStreetMap: no feature with this name (Texas-wide name search) (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Wren: Construct New 345 kV Station
Interconnect the Eolic load to the new Wren 345 kV station via (2) new single circuits from Rio Hondo 345 kV station.
ERCOT project 104463
AEP TCC
Tier 4
Planned
Future tab
345 Nov 2027 Wren
Cameron County
Wren

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 2026104463Projected in-service dateNov 2028 → Nov 2027
June 1, 2026104463First listedon the Future tab

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.