Palmito
Named in 2 listed projects in ERCOT’s transmission project tracking workbook, in Cameron County. First named in the release with data as of February 1, 2016.
Cameroncounty as printed
345kV
AEP TCC/AEP TCC/SLU, SLUutility
2projects listed
No HIFLD substation record has this name in this county.
Generation interconnection requests filed in Cameron, TX: ERCOT queue, 30 active of 32. Same county, not the same substation.
Projects naming this substation
As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.
| Project | Utility | Status as reported | kV | Projected in service | Terminals | Substations named |
|---|---|---|---|---|---|---|
| Adding back in Sharyland Kingfisher Station with a Planned ISD 05/31/2026 ERCOT project 105347 · RPG 21RPG017 |
SLU Tier 2 |
Under Construction Completed tab |
345 | Jun 2026 actual 2026-06 |
Palmito to Stewart Road Cameron County |
Palmito, Stewart Road |
| Chalybe to Palmito: Construct New 345 kV Double Circuit Line Construct a new 345 kV double circuit line from Chalybe to Palmito ERCOT project 98622 · utility no. TP2025010 · RPG 24RPG008 |
AEP TCC/AEP TCC/SLU Tier 1 |
Planned Future tab |
345 | Oct 2028 | Chalybe to Palmito Cameron County |
Chalybe, Palmito |
Changes between releases
Where two consecutive releases print different values for these projects (last ten releases).
| Release (data as of) | Project | What changed | Printed values |
|---|---|---|---|
| July 13, 2026 | 105347 | Moved between tabs | Current-year planned → Completed |
| June 1, 2026 | 105347 | First listed | on the Current-year planned tab |
| June 1, 2026 | 98622 | Projected in-service date | Mar 2028 → Oct 2028 |
| October 1, 2025 | 98622 | First listed | on the Future tab |
Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.
Before relying on any of this
- TPIT lists substation work only where it changes a transmission line or autotransformer rating. A new load-serving substation that changes no rating may never appear in it.
- Every value is the Transmission Service Provider's own statement, compiled by ERCOT. Status and in-service dates are not ERCOT determinations.
- The workbook tab (Future, Current-year planned, Completed, Cancelled) is assigned by ERCOT from dates; the status column is the TSP's word. The two can disagree, and both are shown.
- In ERCOT's competitive areas the company named is the transmission and distribution wires company, not a retail electricity provider or a generator.
- ERCOT publishes the workbook about three times a year, plus occasional updates. A substation that is not listed may simply not be reported yet.
- Substation names are read from the workbook's "from" and "to" terminal columns; for rows with neither, from fixed patterns in the title and description. No language model reads this workbook.
- An entry is a name within a county, not a verified physical facility. A link to a HIFLD record means the names and counties agree exactly, not that the two are confirmed to be one facility.