Gulch

Named in 1 listed project in ERCOT’s transmission project tracking workbook, in Cameron County. First named in the release with data as of October 1, 2023.

Cameroncounty as printed
345kV
AEP TCCutility
1projects listed

Described as new. The quoted wording calls this substation new. “Gulch: Construct new 345 kV Station” — project 69463 title, as the utility reported it

Reported complete. Project 69463 is on the Completed tab (actual in-service 2025-12), as the utility reported it. That indicates the substation may now be built; it is not a confirmation.

No HIFLD substation record has this name in this county.

Generation interconnection requests filed in Cameron, TX: ERCOT queue, 30 active of 32. Same county, not the same substation.

Location

26.2547, -97.6154 · Cameron County, TX · view on a map

Read off a planning map. Read off a planning map by matching it to roads and other mapped features. Accurate to about ±500 m, as estimated by the research. This is where planning documents put the substation, not a surveyed or built site, and a planned site can move.

How it was located: Symbol anchored: the green 345-kV substation dot labelled Gulch on the La Palma to Rio Hondo 345-kV line, just south of Rio Hondo, on ERCOT Figure 9.1 'Map of Option 2A' (24RPG008 Board item 6.1, PDF p.44; light basemap with town names). Read off the map (903x841 px, ~60 m/px) with a least-squares affine fit on 13 OSM substations (Palmito, Port Isabel, Marconi, Laureles, Los Fresnos, Military Highway, Highway 511, Coffee Port, Central Avenue, La Palma 345 kV, Rio Hondo, Oleander, Villa Cavazos); residuals 0.02-1.3 km overall, 0.15 km at Rio Hondo (the nearest anchor, 2.5 km north). The point is 0.24 km from OSM 345-kV line way 174789435, consistent with 'on the La Palma to Rio Hondo 345 kV line'. +/- ~500 m.

Note: TPIT lists 69463 on the Completed tab: in service, actual date 2025-12. OSM (2026-11-20) has no mapped yard at the point yet.

County: the Census county at this point.

Sources: ERCOT Board item 6.1: Independent Review of AEPSC Brownsville Area Improvements Transmission Project (24RPG008) (2024-11-21), PDF p.44, Figure 9.1 Map of Option 2A · ERCOT Transmission Project and Information Tracking (TPIT) workbook, projects 69463 (release 2026-10), Completed tab · OpenStreetMap: Rio Hondo and Brownsville-area anchors; 345 kV lines near Rio Hondo (OSM base 2026-11-20). Map data © OpenStreetMap contributors, available under the Open Database License. Researched by Substation Scout; checked November 21, 2026.

Projects naming this substation

As the utility reported them in the current release. The tab is ERCOT’s; the status is the utility’s.

ProjectUtilityStatus as reportedkVProjected in serviceTerminalsSubstations named
Gulch: Construct new 345 kV Station
Interconnect Arroyo Solar to the new Gulch 345 kV station on the La Palma to Rio Hondo 345 kV line
ERCOT project 69463
AEP TCC
Tier 4
Planned
Completed tab
345 Jan 2026
actual 2025-12
Gulch
Cameron County
Gulch

Changes between releases

Where two consecutive releases print different values for these projects (last ten releases).

Release (data as of)ProjectWhat changedPrinted values
July 13, 202669463Moved between tabsCurrent-year planned → Completed
February 1, 202669463Projected in-service dateDec 2025 → Jan 2026
October 1, 202569463Projected in-service dateMay 2025 → Dec 2025
June 1, 202569463Moved between tabsFuture → Current-year planned
February 1, 202569463Projected in-service dateNov 2024 → May 2025
June 1, 202469463Projected in-service dateApr 2024 → Nov 2024

Source: ERCOT TPIT workbook, data as of October 1, 2026, retrieved 2026-10-26; posting page last checked 2026-11-23. Each row is cited by sheet and row number in the workbook.