Winterpock I
PJM queue ID AE1-074
Winterpock I (AE1-074) is listed in the PJM interconnection queue as a 13.3 MW solar project in Chesterfield County, VA. The filing names Winterpock as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 30, 2026.
| Queue ID | AE1-074 |
|---|---|
| Project name | Winterpock I |
| Status (as published) | In Service |
| Substation | Winterpock |
| Point of interconnection | Winterpock 34.5 kV |
| County | Chesterfield |
| State | VA |
| Voltage | 34.5 kV |
| Capacity | 13.3 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2026-06-30 |
| Source dataset | serial |
Same substation and county
Winterpock substation: 3 requests in the PJM queue, 3 active totaling 44.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-106 | 360 Solar Center, LLC | 15.6 | Solar | Active |
| AH1-107 | 360 Solar Center, LLC | 15.6 | Solar | Active |
Chesterfield, VA: 41 requests in the PJM queue, 21 active totaling 2,439.7 MW.
A substation with the same name is named in PJM transmission planning materials: Winterpock (DOM, 1 mention).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-11-16 | Status change | n/a | Partially in Service - Under Construction → In Service |
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 20 |
| MW capacity | 13.3 |
| MFO | 20 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.