Baltimore City, MD interconnection queue

4 active projects totalling 275 MW in the PJM queue, plus 8 with terminal status (shown greyed).

4active projects
275active MW
12total filed
Queue IDProjectkVMWResourceStatus
C01-1916 Granite - Harrisonville 115 kV 115 200 Battery Active
V1-033 Fairfield Renewable Energy Facility 115 132 Other Withdrawn
S67 Gould Street n/r 101 Gas Deactivated
C01-1684 Erdman 115 kV 115 75 Battery Active
W1-033 Fairfield Renewable Energy Facility 115 25 Other Withdrawn
C01-2130 PHILA5A 115 KV 34.5 kV 115 20 Battery Withdrawn
C01-2129 ERDMAN 13.8 kV 13.8 10 Battery Withdrawn
B22 Gould St. 34.5 kV 34.5 9.9 Gas Withdrawn
AE1-151 PACA Street 13.8kV 13.8 9 Gas Withdrawn
AB1-020 Cold Spring 240v n/r 0 Battery Withdrawn
Q31 Hawkins Point 34 0 Gas In Service
S30 Sun Paper n/r 0 Other In Service