Washington, VA interconnection queue
2 active projects
totaling 34 MW in the PJM queue, plus 3 with terminal status (shown grayed).
2 active projects
34 active MW
5 total filed
Queue ID Project kV MW Resource Status
AI2-002
Vanceville 138 kV
138
150
Battery
Withdrawn
AH1-063
Spring Creek – South Abingdon 138 kV
138
100
Battery
Withdrawn
AH2-072
Damascus 69 kV
69
62.1
Battery
Withdrawn
AE1-178
Wolf Hills Energy Plant
138
19
Gas
In Service
N11
Wolf Hills Energy Plant
138
15
Gas
In Service
A request with terminal status left the queue as filed.
That is a record of the filing, not evidence of injection capacity at this location.
Confirm deliverability with PJM before relying on these figures.
Site Scanner draws on HIFLD substations and electric retail service
territories, newer substations HIFLD lacks from OpenStreetMap, EIA gas transmission pipelines, HIFLD gas facilities and gas
utility territories, USGS watershed boundaries, FEMA flood hazard layers and US Census
geocoding. Queue data is compiled from public interconnection
queue filings. Every figure carries its source and retrieval date.
A withdrawal records that a request left the queue. It says
nothing about injection capacity at that location. Verify with the relevant ISO before
relying on any figure. Queue datasets are tracked separately and are
not directly comparable: status vocabularies, fuel coding, and publication
cadence all differ.
Screening aid only. Not a system impact study. Contiguous US.