Washington, VA interconnection queue

2 active projects totalling 34 MW in the PJM queue, plus 3 with terminal status (shown greyed).

2active projects
34active MW
5total filed
Queue IDProjectkVMWResourceStatus
AI2-002 Vanceville 138 kV 138 150 Battery Withdrawn
AH1-063 Spring Creek – South Abingdon 138 kV 138 100 Battery Withdrawn
AH2-072 Damascus 69 kV 69 62.1 Battery Withdrawn
AE1-178 Wolf Hills Energy Plant 138 19 Gas In Service
N11 Wolf Hills Energy Plant 138 15 Gas In Service

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.