Upton

PJM queue ID G51_W63

Upton (G51_W63) is listed in the PJM interconnection queue as a 9.9 MW gas project in Franklin County, PA. PJM lists its status as “In Service”, with a target commercial operation date of April 1, 2003.

Queue IDG51_W63
Project nameUpton
Status (as published)In Service
SubstationUpton
Point of interconnectionUpton 34.5 kV
CountyFranklin
StatePA
Voltage34.5 kV
Capacity9.9 MW
Resource (as published)Methane
Resource categoryGas (normalized for filtering)
Target commercial operation2003-04-01
Source datasetserial

Same substation and county

Upton substation: 3 requests in the PJM queue, 2 active totaling 14 MW.

Queue IDProjectMWResourceStatus
I14Upton4.1GasIn Service
X1-028Upton 34.5kV7.6SolarWithdrawn

Franklin, PA: 80 requests in the PJM queue, 20 active totaling 384.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy9.9
MW capacity9.9
MFO9.9

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.