Spectrum Solar
PJM queue ID AD2-058
Spectrum Solar (AD2-058) is listed in the PJM interconnection queue as a 2.4 MW solar project in Prince George's County, MD. The filing names St. Barnabas as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of June 3, 2022.
| Queue ID | AD2-058 |
|---|---|
| Project name | Spectrum Solar |
| Status (as published) | In Service |
| Substation | St. Barnabas |
| Point of interconnection | St. Barnabas 13 kV |
| County | Prince George's |
| State | MD |
| Voltage | 13 kV |
| Capacity | 2.4 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2022-06-03 |
| Source dataset | serial |
Same substation and county
St. Barnabas substation: 3 requests in the PJM queue, 1 active totaling 2.4 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AE2-336 | St. Barnabas 13 kV | 1.9 | Solar | Withdrawn |
| AE2-337 | St. Barnabas 13 kV | 1 | Solar | Withdrawn |
Prince George's, MD: 57 requests in the PJM queue, 14 active totaling 3,551.2 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 5.6 |
| MW capacity | 2.38 |
| MFO | 5.6 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.