Riverside 115 kV (C01-1566) is listed in the PJM interconnection queue as a 50 MW battery project in Anne Arundel County, MD. The filing names Riverside as its point of interconnection. PJM lists its status as “Active”, with a target commercial operation date of June 1, 2029.
| Queue ID | C01-1566 |
|---|---|
| Project name | Riverside 115 kV |
| Status (as published) | Active |
| Substation | Riverside |
| Point of interconnection | Riverside 115 kV |
| County | Anne Arundel |
| State | MD |
| Voltage | 115 kV |
| Capacity | 50 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-06-01 |
| Source dataset | cycle |
Same substation and county
Riverside substation: 5 requests in the PJM queue, 3 active totaling 250 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| C01-1564 | Riverside 115 kV | 150 | Battery | Active |
| C01-1565 | Riverside 115 kV | 50 | Battery | Active |
| S33 | Riverside | 85 | Gas | Withdrawn |
| AB1-075 | Riverside 115kV | 0 | Battery | Withdrawn |
Anne Arundel, MD: 29 requests in the PJM queue, 11 active totaling 1,322.7 MW.
A substation with the same name is named in PJM transmission planning materials: Riverside (BGE, 11 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | RIVERSIDE BATTERY STORAGE, LLC |
|---|---|
| Transmission owner | BGE |
| Project type | Generation Interconnection |
| Cycle | C01 |
| Stage | Phase 1 |
| MW energy | 50.0 |
| MW capacity | 50.0 |
| MFO | 250.0 |
| Submitted date | 4/27/2026 |
| Last updated | 6/22/2026 |