Remington GT3

PJM queue ID AE2-132

Remington GT3 (AE2-132) is listed in the PJM interconnection queue as a 17.7 MW gas project in Fauquier County, VA. The filing names Remington CT as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of May 31, 2020.

Queue IDAE2-132
Project nameRemington GT3
Status (as published)In Service
SubstationRemington CT
Point of interconnectionRemington CT 230 kV
CountyFauquier
StateVA
Voltage230 kV
Capacity17.7 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2020-05-31
Source datasetserial

Same substation and county

Remington CT substation: 10 requests in the PJM queue, 6 active totaling 186.7 MW.

Queue IDProjectMWResourceStatus
AH1-220Remington BESS60BatteryEP
AG1-152Remington BESS40BatteryEngineering and Procurement
AH1-685Remington GT226GasEP
AH1-684Remington GT123GasEP
AH1-693Remington GT420GasEP
W1-074Remington CT 230kV498GasWithdrawn
AI2-287Remington CT 230 kV18.3GasWithdrawn
AI2-288Remington CT 230 kV16.9GasWithdrawn
AI2-289Remington CT 230 kV16.3GasWithdrawn

Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.

A substation with the same name is named in PJM transmission planning materials: Remington CT (DOM, 8 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy0
MW capacity17.7
MFO190

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first