Remington GT4 (AH1-693) is listed in the PJM interconnection queue as a 20 MW gas project in Fauquier County, VA. The filing names Remington CT as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of April 15, 2029.

Queue IDAH1-693
Project nameRemington GT4
Status (as published)EP
SubstationRemington CT
Point of interconnectionRemington CT 230 kV
CountyFauquier
StateVA
Voltage230 kV
Capacity20 MW
Resource (as published)Natural Gas
Resource categoryGas (normalized for filtering)
Target commercial operation2029-04-15
Source datasetcycle

Same substation and county

Remington CT substation: 10 requests in the PJM queue, 6 active totaling 186.7 MW.

Queue IDProjectMWResourceStatus
AH1-220Remington BESS60BatteryEP
AG1-152Remington BESS40BatteryEngineering and Procurement
AH1-685Remington GT226GasEP
AH1-684Remington GT123GasEP
AE2-132Remington GT317.7GasIn Service
W1-074Remington CT 230kV498GasWithdrawn
AI2-287Remington CT 230 kV18.3GasWithdrawn
AI2-288Remington CT 230 kV16.9GasWithdrawn
AI2-289Remington CT 230 kV16.3GasWithdrawn

Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.

A substation with the same name is named in PJM transmission planning materials: Remington CT (DOM, 8 mentions).

Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.

Tracked changes

1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.

DetectedChangeMWStatus was → now
2026-09-07 Status change n/a Active → EP

Full change log →

Additional filed fields

DeveloperVirginia Electric and Power Company (d/b/a Dominion Energy Virginia)
Transmission ownerDominion
Project typeGeneration Interconnection
CycleTC2
StageFinal Agreement
MW energy0.0
MW capacity20.0
MFO190.0
Submitted date4/8/2025
Last updated6/25/2026

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first