Remington GT4
PJM queue ID AH1-693
Remington GT4 (AH1-693) is listed in the PJM interconnection queue as a 20 MW gas project in Fauquier County, VA. The filing names Remington CT as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of April 15, 2029.
| Queue ID | AH1-693 |
|---|---|
| Project name | Remington GT4 |
| Status (as published) | EP |
| Substation | Remington CT |
| Point of interconnection | Remington CT 230 kV |
| County | Fauquier |
| State | VA |
| Voltage | 230 kV |
| Capacity | 20 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2029-04-15 |
| Source dataset | cycle |
Same substation and county
Remington CT substation: 10 requests in the PJM queue, 6 active totaling 186.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AH1-220 | Remington BESS | 60 | Battery | EP |
| AG1-152 | Remington BESS | 40 | Battery | Engineering and Procurement |
| AH1-685 | Remington GT2 | 26 | Gas | EP |
| AH1-684 | Remington GT1 | 23 | Gas | EP |
| AE2-132 | Remington GT3 | 17.7 | Gas | In Service |
| W1-074 | Remington CT 230kV | 498 | Gas | Withdrawn |
| AI2-287 | Remington CT 230 kV | 18.3 | Gas | Withdrawn |
| AI2-288 | Remington CT 230 kV | 16.9 | Gas | Withdrawn |
| AI2-289 | Remington CT 230 kV | 16.3 | Gas | Withdrawn |
Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.
A substation with the same name is named in PJM transmission planning materials: Remington CT (DOM, 8 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
1 change observed between weekly snapshots of the PJM queue since PJM tracking began on August 27, 2026. MW is nameplate as filed; for a capacity revision it is the change, not the new total.
| Detected | Change | MW | Status was → now |
|---|---|---|---|
| 2026-09-07 | Status change | n/a | Active → EP |
Additional filed fields
| Developer | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Final Agreement |
| MW energy | 0.0 |
| MW capacity | 20.0 |
| MFO | 190.0 |
| Submitted date | 4/8/2025 |
| Last updated | 6/25/2026 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.