Remington BESS
PJM queue ID AH1-220
Remington BESS (AH1-220) is listed in the PJM interconnection queue as a 60 MW battery project in Fauquier County, VA. The filing names Remington CT as its point of interconnection. PJM lists its status as “EP”, with a target commercial operation date of December 31, 2029.
| Queue ID | AH1-220 |
|---|---|
| Project name | Remington BESS |
| Status (as published) | EP |
| Substation | Remington CT |
| Point of interconnection | Remington CT 230 kV |
| County | Fauquier |
| State | VA |
| Voltage | 230 kV |
| Capacity | 60 MW |
| Resource (as published) | Storage |
| Resource category | Battery (normalized for filtering) |
| Target commercial operation | 2029-12-31 |
| Source dataset | cycle |
Same substation and county
Remington CT substation: 10 requests in the PJM queue, 6 active totaling 186.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AG1-152 | Remington BESS | 40 | Battery | Engineering and Procurement |
| AH1-685 | Remington GT2 | 26 | Gas | EP |
| AH1-684 | Remington GT1 | 23 | Gas | EP |
| AH1-693 | Remington GT4 | 20 | Gas | EP |
| AE2-132 | Remington GT3 | 17.7 | Gas | In Service |
| W1-074 | Remington CT 230kV | 498 | Gas | Withdrawn |
| AI2-287 | Remington CT 230 kV | 18.3 | Gas | Withdrawn |
| AI2-288 | Remington CT 230 kV | 16.9 | Gas | Withdrawn |
| AI2-289 | Remington CT 230 kV | 16.3 | Gas | Withdrawn |
Fauquier, VA: 52 requests in the PJM queue, 18 active totaling 2,367 MW.
A substation with the same name is named in PJM transmission planning materials: Remington CT (DOM, 8 mentions).
Same name and transmission owner. Matched on name and transmission owner: the utility that presented this substation in PJM planning materials is the transmission owner recorded on the queue filings at a substation of the same name. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Developer | Virginia Electric and Power Company (d/b/a Dominion Energy Virginia) |
|---|---|
| Transmission owner | Dominion |
| Project type | Generation Interconnection |
| Cycle | TC2 |
| Stage | Final Agreement |
| MW energy | 0.0 |
| MW capacity | 60.0 |
| MFO | 100.0 |
| Submitted date | 9/8/2021 |
| Last updated | 12/19/2025 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.