Substation Scout

Old Chapel-Millville substation interconnection queue

1 active project totaling 56 MW in the PJM queue, plus 4 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jun 2019 to Jul 2028 (5 filings). 1 active filing targets a date after November 27, 2026.

1active projects
56active MW
5total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-307 Franklintown Farm Solar and BESS 138 56 Hybrid Engineering and Procurement Jul 2028
AD2-158 Wild Hill Solar 138 46.5 Solar Withdrawn Sep 2024
AI2-375 Old Chapel-Millville 138 kV 138 24 Solar Withdrawn Dec 2026
AG1-097 Old Chapel-Millville 138 kV 138 13 Solar Withdrawn Sep 2022
AD1-158 Old Chapel-Millville 138kV 138 12 Solar Withdrawn Jun 2019

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Jefferson County, WV

All 15 PJM queue filings in Jefferson County, WV.

Other PJM queue substations in City of Chesapeake, VA

All 50 PJM queue filings in City of Chesapeake, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first