Old Chapel-Millville substation interconnection queue
1 active project totaling 56 MW in the PJM queue, plus 4 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2019 to Jul 2028 (5 filings). 1 active filing targets a date after November 27, 2026.
1active projects
56active MW
5total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-307 | Franklintown Farm Solar and BESS | 138 | 56 | Hybrid | Engineering and Procurement | Jul 2028 |
| AD2-158 | Wild Hill Solar | 138 | 46.5 | Solar | Withdrawn | Sep 2024 |
| AI2-375 | Old Chapel-Millville 138 kV | 138 | 24 | Solar | Withdrawn | Dec 2026 |
| AG1-097 | Old Chapel-Millville 138 kV | 138 | 13 | Solar | Withdrawn | Sep 2022 |
| AD1-158 | Old Chapel-Millville 138kV | 138 | 12 | Solar | Withdrawn | Jun 2019 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Jefferson County, WV
- Millville-Old Chapel: 1 active, 59.4 MW of 3 filed
- PF Hydro: 2 active, 6.3 MW of 2 filed
Other PJM queue substations in City of Chesapeake, VA
- Harper: 3 active, 756.6 MW of 3 filed
- Hickory: 1 active, 120 MW of 9 filed
- Elizabeth River: 3 active, 60 MW of 3 filed
- Grassfield: 1 active, 12.6 MW of 3 filed
- Fentress: none active of 4 filed
- Chesapeake: none active of 3 filed
- Loudoun: none active of 3 filed
- Deep Creek: none active of 2 filed
- Fentress- Landstown: none active of 2 filed