Old Chapel-Millville substation interconnection queue

1 active project totalling 56 MW in the PJM queue, plus 4 with terminal status (shown greyed).

1active projects
56active MW
5total filed
Queue IDProjectkVMWResourceStatus
AG1-307 Franklintown Farm Solar and BESS 138 56 Hybrid Engineering and Procurement
AD2-158 Wild Hill Solar 138 46.5 Solar Withdrawn
AI2-375 Old Chapel-Millville 138 kV 138 24 Solar Withdrawn
AG1-097 Old Chapel-Millville 138 kV 138 13 Solar Withdrawn
AD1-158 Old Chapel-Millville 138kV 138 12 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.