Hickory substation interconnection queue

1 active project totalling 120 MW in the PJM queue, plus 8 with terminal status (shown greyed).

1active projects
120active MW
9total filed
Queue IDProjectkVMWResourceStatus
C01-1366 Hickory 230 kV 230 120 Battery Active
AG1-383 Hickory 34.5 kV 34.5 15.4 Hybrid Withdrawn
AD2-186 Hickory 34.5 kV 34.5 14.4 Solar Withdrawn
AA2-180 Chesapeake Solar 34.5 14 Solar Withdrawn
AE1-027 Hickory Solar 34.5 13.1 Solar Withdrawn
AC1-047 TWE Chesapeake Solar 34.5 12.9 Solar Withdrawn
AD2-187 Hickory 34.5 kV 34.5 8.6 Solar Withdrawn
AE1-028 Hickory Solar 34.5 7.6 Solar Withdrawn
AD1-159 Hickory 34.5 kV 34.5 7.2 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.