Hickory substation interconnection queue
1 active project totalling 120 MW in the PJM queue, plus 8 with terminal status (shown greyed).
1active projects
120active MW
9total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| C01-1366 | Hickory 230 kV | 230 | 120 | Battery | Active |
| AG1-383 | Hickory 34.5 kV | 34.5 | 15.4 | Hybrid | Withdrawn |
| AD2-186 | Hickory 34.5 kV | 34.5 | 14.4 | Solar | Withdrawn |
| AA2-180 | Chesapeake Solar | 34.5 | 14 | Solar | Withdrawn |
| AE1-027 | Hickory Solar | 34.5 | 13.1 | Solar | Withdrawn |
| AC1-047 | TWE Chesapeake Solar | 34.5 | 12.9 | Solar | Withdrawn |
| AD2-187 | Hickory 34.5 kV | 34.5 | 8.6 | Solar | Withdrawn |
| AE1-028 | Hickory Solar | 34.5 | 7.6 | Solar | Withdrawn |
| AD1-159 | Hickory 34.5 kV | 34.5 | 7.2 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.