Grassfield substation interconnection queue

1 active project totaling 12.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).

3 PJM queue filings name Grassfield as the point of interconnection, all in City of Chesapeake, VA.

Target commercial operation dates as filed run from Oct 2017 to Dec 2024 (3 filings).

1active projects
12.6active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF2-057 Cedar Energy Center 34.5 20 Battery Withdrawn Dec 2024
AB2-086 Grassfield 13.2kV 13.2 13 Solar Withdrawn Oct 2017
AC1-147 Grassfield 34.5kV 34.5 12.6 Solar In Service Dec 2021

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in City of Chesapeake, VA

All 50 PJM queue filings in City of Chesapeake, VA.