Grassfield substation interconnection queue
1 active project totalling 12.6 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
12.6active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AF2-057 | Cedar Energy Center | 34.5 | 20 | Battery | Withdrawn |
| AB2-086 | Grassfield 13.2kV | 13.2 | 13 | Solar | Withdrawn |
| AC1-147 | Grassfield 34.5kV | 34.5 | 12.6 | Solar | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.