Grassfield substation interconnection queue
1 active project totaling 12.6 MW in the PJM queue, plus 2 with terminal status (shown grayed).
3 PJM queue filings name Grassfield as the point of interconnection, all in City of Chesapeake, VA.
Target commercial operation dates as filed run from Oct 2017 to Dec 2024 (3 filings).
1active projects
12.6active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF2-057 | Cedar Energy Center | 34.5 | 20 | Battery | Withdrawn | Dec 2024 |
| AB2-086 | Grassfield 13.2kV | 13.2 | 13 | Solar | Withdrawn | Oct 2017 |
| AC1-147 | Grassfield 34.5kV | 34.5 | 12.6 | Solar | In Service | Dec 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in City of Chesapeake, VA
- Harper: 3 active, 756.6 MW of 3 filed
- Hickory: 1 active, 120 MW of 9 filed
- Elizabeth River: 3 active, 60 MW of 3 filed
- Old Chapel-Millville: 1 active, 56 MW of 5 filed
- Fentress: none active of 4 filed
- Chesapeake: none active of 3 filed
- Loudoun: none active of 3 filed
- Deep Creek: none active of 2 filed
- Fentress- Landstown: none active of 2 filed
Site Scanner