Elizabeth River substation interconnection queue
3 active projects totalling 60 MW in the PJM queue.
3active projects
60active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| S90 | Elizabeth River GT1 | 230 | 20 | Gas | In Service |
| S91 | Elizabeth River GT2 | 230 | 20 | Gas | In Service |
| S92 | Elizabeth River GT3 | 230 | 20 | Gas | In Service |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.