Fentress- Landstown substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 2 with terminal status (shown grayed).
2 PJM queue filings name Fentress- Landstown as the point of interconnection, all in City of Chesapeake, VA.
Target commercial operation date as filed: Mar 2027 (2 filings).
0active projects
0active MW
2total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AH2-133 | Fentress- Landstown 230kV | 230 | 300 | Battery | Withdrawn | Mar 2027 |
| AH2-330 | Fentress- Landstown 230kV | 230 | 100 | Battery | Withdrawn | Mar 2027 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in City of Chesapeake, VA
- Harper: 3 active, 756.6 MW of 3 filed
- Hickory: 1 active, 120 MW of 9 filed
- Elizabeth River: 3 active, 60 MW of 3 filed
- Old Chapel-Millville: 1 active, 56 MW of 5 filed
- Grassfield: 1 active, 12.6 MW of 3 filed
- Fentress: none active of 4 filed