Chesapeake substation interconnection queue
0 active projects totaling 0 MW in the PJM queue, plus 3 with terminal status (shown grayed).
3 PJM queue filings name Chesapeake as the point of interconnection, all in City of Chesapeake, VA.
Target commercial operation dates as filed run from Jan 2021 to Jun 2022 (3 filings).
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AE2-007 | Chesapeake 230 kV | 230 | 967.6 | Gas | Withdrawn | Jun 2022 |
| AB2-051 | Chesapeake 230kV | 230 | 765.5 | Gas | Withdrawn | Jan 2021 |
| AC1-159 | Chesapeake 230kV | 230 | 369.1 | Gas | Withdrawn | Jan 2021 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Same name on other Substation Scout pages
Other sources that print a substation named “Chesapeake” in VA. They are matched by name and state only, so a page listed here may describe a different substation with the same name. Check the location and utility on each. Where a PJM planning record prints no state, the match is by name within the states the utility zone serves, which is weaker.
- Chesapeake: Expansion Tracker, PJM planning: APS state not printed
Other PJM queue substations in City of Chesapeake, VA
- Harper: 3 active, 756.6 MW of 3 filed
- Hickory: 1 active, 120 MW of 9 filed
- Elizabeth River: 3 active, 60 MW of 3 filed
- Old Chapel-Millville: 1 active, 56 MW of 5 filed
- Grassfield: 1 active, 12.6 MW of 3 filed
- Fentress: none active of 4 filed
- Loudoun: none active of 3 filed
- Deep Creek: none active of 2 filed
- Fentress- Landstown: none active of 2 filed