Franklintown Farm Solar and BESS

PJM queue ID AG1-307

Franklintown Farm Solar and BESS (AG1-307) is listed in the PJM interconnection queue as a 56 MW hybrid project in Jefferson County, WV. The filing names Old Chapel-Millville as its point of interconnection. PJM lists its status as “Engineering and Procurement”, with a target commercial operation date of July 30, 2028.

Queue IDAG1-307
Project nameFranklintown Farm Solar and BESS
Status (as published)Engineering and Procurement
SubstationOld Chapel-Millville
Point of interconnectionOld Chapel-Millville 138 kV
CountyJefferson
StateWV
Voltage138 kV
Capacity56 MW
Resource (as published)Solar; Storage
Resource categoryHybrid (normalized for filtering)
Target commercial operation2028-07-30
Source datasetserial

Same substation and county

Old Chapel-Millville substation: 5 requests in the PJM queue, 1 active totaling 56 MW.

Queue IDProjectMWResourceStatus
AD2-158Wild Hill Solar46.5SolarWithdrawn
AI2-375Old Chapel-Millville 138 kV24SolarWithdrawn
AG1-097Old Chapel-Millville 138 kV13SolarWithdrawn
AD1-158Old Chapel-Millville 138kV12SolarWithdrawn

Jefferson, WV: 15 requests in the PJM queue, 5 active totaling 259.3 MW.

Tracked changes

No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →

Additional filed fields

Project typeGeneration Interconnection
MW energy80
MW capacity56
MFO80

Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first