Substation Scout

City of Chesapeake, VA interconnection queue

10 active projects totalling 1,016 MW in the PJM queue, plus 40 with terminal status (shown greyed).

10active projects
1,016active MW
50total filed
Queue IDProjectkVMWResourceStatus
AE2-007 Chesapeake 230 kV 230 967.6 Gas Withdrawn
AB2-051 Chesapeake 230kV 230 765.5 Gas Withdrawn
AC1-159 Chesapeake 230kV 230 369.1 Gas Withdrawn
AH2-133 Fentress- Landstown 230kV 230 300 Battery Withdrawn
AF1-124 CVOW 2, OSS 2 – T2G07 230 254.1 Offshore Wind UC-ISP
AF1-123 CVOW 1, OSS 1 - T1L11 230 253.2 Offshore Wind UC
AF1-125 CVOW 3, OSS 3 – T3G15 230 249.3 Offshore Wind UC-ISP
AH1-444 Fentress – Sligo 230 kV 230 170 Battery Withdrawn
AG1-359 Fentress 230 kV 230 127.5 Battery Withdrawn
AG1-235 Fentress-Sligo 230 kV 230 115.2 Solar Withdrawn
AE2-156 Yadkins Energy Center 115 100 Battery EP
AH2-330 Fentress- Landstown 230kV 230 100 Battery Withdrawn
AH1-262 Deep Creek 115 kV 115 60 Battery Withdrawn
AI2-158 Fentress - Sligo 230kV (CIR Increase) 230 48 Solar Withdrawn
AH2-241 Loudoun 115kV 115 45 Battery Withdrawn
AC2-012 Shillelagh Solar 115 44.8 Solar In Service
AD1-033 Bedford Solar Center 230 42 Solar In Service
AG1-364 Deep Creek 115 kV 115 40 Battery Withdrawn
AF2-057 Cedar Energy Center 34.5 20 Battery Withdrawn
S90 Elizabeth River GT1 230 20 Gas In Service
S91 Elizabeth River GT2 230 20 Gas In Service
S92 Elizabeth River GT3 230 20 Gas In Service
AG1-383 Hickory 34.5 kV 34.5 15.4 Hybrid Withdrawn
AD2-186 Hickory 34.5 kV 34.5 14.4 Solar Withdrawn
AA2-180 Chesapeake Solar 34.5 14 Solar Withdrawn
AE1-027 Hickory Solar 34.5 13.1 Solar Withdrawn
AB2-086 Grassfield 13.2kV 13.2 13 Solar Withdrawn
AC1-047 TWE Chesapeake Solar 34.5 12.9 Solar Withdrawn
AC1-147 Grassfield 34.5kV 34.5 12.6 Solar In Service
AD1-158 Old Chapel-Millville 138kV 138 12 Solar Withdrawn
AH1-420 Fentress 34.5kV 34.5 10.8 Solar Withdrawn
AC2-196 Centerville Pike Solar 34.5 10 Solar Withdrawn
AC1-046 Centerville Pike Solar 34.5 9.7 Solar Withdrawn
AD2-187 Hickory 34.5 kV 34.5 8.6 Solar Withdrawn
AE1-028 Hickory Solar 34.5 7.6 Solar Withdrawn
AD1-159 Hickory 34.5 kV 34.5 7.2 Solar Withdrawn
AH2-297 Not reported n/r 0 Solar Withdrawn
AH2-298 Not reported n/r 0 Solar Withdrawn
AH2-299 Not reported n/r 0 Solar Withdrawn
AH2-300 Not reported n/r 0 Solar Withdrawn
AH2-301 Not reported n/r 0 Solar Withdrawn
AH2-302 Not reported n/r 0 Solar Withdrawn
AH2-303 Not reported n/r 0 Solar Withdrawn
AH2-304 Not reported n/r 0 Solar Withdrawn
AH2-305 Not reported n/r 0 Solar Withdrawn
AH2-306 Not reported n/r 0 Solar Withdrawn
AH2-307 Not reported n/r 0 Solar Withdrawn
AH2-308 Not reported n/r 0 Solar Withdrawn
AH2-309 Not reported n/r 0 Solar Withdrawn
AH2-310 Not reported n/r 0 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.