Jefferson, WV interconnection queue

5 active projects totalling 259.3 MW in the PJM queue, plus 10 with terminal status (shown greyed).

5active projects
259.3active MW
15total filed
Queue IDProjectkVMWResourceStatus
C01-1999 Old Chapel - Millville 138 kV 138 100 Battery Active
AG1-416 Flowing Springs Farm 138 91 Hybrid Withdrawn
AE2-226 Rippon 138 59.4 Solar Engineering and Procurement
AG1-307 Franklintown Farm Solar and BESS 138 56 Hybrid Engineering and Procurement
AH2-030 Feagan's Mill 138 kV 138 54 Solar Withdrawn
AD2-158 Wild Hill Solar 138 46.5 Solar Withdrawn
AF1-290 Blake Solar 138 40.4 Solar In Service
AI2-367 Sleepy Hollow 138 kV II 138 34 Solar Withdrawn
AH2-031 Feagan's Mill 138 kV II 138 30 Battery Withdrawn
AG2-464 Feagans Mill - Stonewall 138 kV 138 24 Hybrid Withdrawn
AI2-375 Old Chapel-Millville 138 kV 138 24 Solar Withdrawn
AH1-412 Franklintown 34.5 kV 34.5 20 Hybrid Withdrawn
AG1-097 Old Chapel-Millville 138 kV 138 13 Solar Withdrawn
AF2-114 Old Chapel-Millville 138 kV II 138 9 Solar Withdrawn
Z2-040 Dam 4 Hydro Generation Facility; Dam 5 Hydro Generation Facility; Millville Hydroelectric Facility n/r 3.5 Hydro In Service

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.