Fentress substation interconnection queue
0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).
0active projects
0active MW
4total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-359 | Fentress 230 kV | 230 | 127.5 | Battery | Withdrawn |
| AH1-420 | Fentress 34.5kV | 34.5 | 10.8 | Solar | Withdrawn |
| AC2-196 | Centerville Pike Solar | 34.5 | 10 | Solar | Withdrawn |
| AC1-046 | Centerville Pike Solar | 34.5 | 9.7 | Solar | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.