Fentress substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 4 with terminal status (shown greyed).

0active projects
0active MW
4total filed
Queue IDProjectkVMWResourceStatus
AG1-359 Fentress 230 kV 230 127.5 Battery Withdrawn
AH1-420 Fentress 34.5kV 34.5 10.8 Solar Withdrawn
AC2-196 Centerville Pike Solar 34.5 10 Solar Withdrawn
AC1-046 Centerville Pike Solar 34.5 9.7 Solar Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.