Harper substation interconnection queue
3 active projects totaling 756.6 MW in the PJM queue.
3 PJM queue filings name Harper as the point of interconnection, all in City of Chesapeake, VA.
Target commercial operation date as filed: Dec 2032 (3 filings). 3 active filings target a date after November 27, 2026.
Transmission owner as filed: Dominion (3 filings).
3active projects
756.6active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AF1-124 | CVOW 2, OSS 2 – T2G07 | 230 | 254.1 | Offshore Wind | UC-ISP | Dec 2032 |
| AF1-123 | CVOW 1, OSS 1 - T1L11 | 230 | 253.2 | Offshore Wind | UC | Dec 2032 |
| AF1-125 | CVOW 3, OSS 3 – T3G15 | 230 | 249.3 | Offshore Wind | UC-ISP | Dec 2032 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in City of Chesapeake, VA
- Hickory: 1 active, 120 MW of 9 filed
- Elizabeth River: 3 active, 60 MW of 3 filed
- Old Chapel-Millville: 1 active, 56 MW of 5 filed
- Grassfield: 1 active, 12.6 MW of 3 filed
- Fentress: none active of 4 filed
- Chesapeake: none active of 3 filed
- Loudoun: none active of 3 filed
- Deep Creek: none active of 2 filed
- Fentress- Landstown: none active of 2 filed