Harper substation interconnection queue

3 active projects totaling 756.6 MW in the PJM queue.

3 PJM queue filings name Harper as the point of interconnection, all in City of Chesapeake, VA.

Target commercial operation date as filed: Dec 2032 (3 filings). 3 active filings target a date after November 27, 2026.

Transmission owner as filed: Dominion (3 filings).

3active projects
756.6active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AF1-124 CVOW 2, OSS 2 – T2G07 230 254.1 Offshore Wind UC-ISP Dec 2032
AF1-123 CVOW 1, OSS 1 - T1L11 230 253.2 Offshore Wind UC Dec 2032
AF1-125 CVOW 3, OSS 3 – T3G15 230 249.3 Offshore Wind UC-ISP Dec 2032

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in City of Chesapeake, VA

All 50 PJM queue filings in City of Chesapeake, VA.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first