Millville-Old Chapel substation interconnection queue
1 active project totalling 59.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).
1active projects
59.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status |
|---|---|---|---|---|---|
| AG1-182 | Soapstone Solar and BESS | 138 | 65.2 | Solar | Withdrawn |
| AE2-226 | Rippon | 138 | 59.4 | Solar | Engineering and Procurement |
| AG1-186 | Soapstone Solar and BESS | 138 | 34.8 | Battery | Withdrawn |
Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.