Millville-Old Chapel substation interconnection queue
1 active project totaling 59.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).
Target commercial operation dates as filed run from Jun 2023 to Dec 2026 (3 filings). 1 active filing targets a date after November 27, 2026.
1active projects
59.4active MW
3total filed
| Queue ID | Project | kV | MW | Resource | Status | Target COD |
|---|---|---|---|---|---|---|
| AG1-182 | Soapstone Solar and BESS | 138 | 65.2 | Solar | Withdrawn | Jun 2023 |
| AE2-226 | Rippon | 138 | 59.4 | Solar | Engineering and Procurement | Dec 2026 |
| AG1-186 | Soapstone Solar and BESS | 138 | 34.8 | Battery | Withdrawn | Jun 2023 |
A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.
Other PJM queue substations in Clarke County, VA
- Double Toll Gate: 1 active, 3.8 MW of 4 filed
Other PJM queue substations in Jefferson County, WV
- Old Chapel-Millville: 1 active, 56 MW of 5 filed
- PF Hydro: 2 active, 6.3 MW of 2 filed