Millville-Old Chapel substation interconnection queue

1 active project totalling 59.4 MW in the PJM queue, plus 2 with terminal status (shown greyed).

1active projects
59.4active MW
3total filed
Queue IDProjectkVMWResourceStatus
AG1-182 Soapstone Solar and BESS 138 65.2 Solar Withdrawn
AE2-226 Rippon 138 59.4 Solar Engineering and Procurement
AG1-186 Soapstone Solar and BESS 138 34.8 Battery Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.