Millville-Old Chapel substation interconnection queue

1 active project totaling 59.4 MW in the PJM queue, plus 2 with terminal status (shown grayed).

Target commercial operation dates as filed run from Jun 2023 to Dec 2026 (3 filings). 1 active filing targets a date after November 27, 2026.

1active projects
59.4active MW
3total filed
Queue IDProjectkVMWResourceStatusTarget COD
AG1-182 Soapstone Solar and BESS 138 65.2 Solar Withdrawn Jun 2023
AE2-226 Rippon 138 59.4 Solar Engineering and Procurement Dec 2026
AG1-186 Soapstone Solar and BESS 138 34.8 Battery Withdrawn Jun 2023

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.

Other PJM queue substations in Clarke County, VA

All 11 PJM queue filings in Clarke County, VA.

Other PJM queue substations in Jefferson County, WV

All 15 PJM queue filings in Jefferson County, WV.

Site Scanner

Before you spend weeks on a site, spend seconds screening it.

Scan a site →

Or read a sample report first