North Temple 230 kV
PJM queue ID A18
North Temple 230 kV (A18) is listed in the PJM interconnection queue as a 557 MW gas project in Berks County, PA. The filing names North Temple as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of December 1, 2002.
| Queue ID | A18 |
|---|---|
| Project name | North Temple 230 kV |
| Status (as published) | In Service |
| Substation | North Temple |
| Point of interconnection | North Temple 230 kV |
| County | Berks |
| State | PA |
| Voltage | 230 kV |
| Capacity | 557 MW |
| Resource (as published) | Natural Gas |
| Resource category | Gas (normalized for filtering) |
| Target commercial operation | 2002-12-01 |
| Source dataset | serial |
Same substation and county
North Temple substation: 6 requests in the PJM queue, 1 active totaling 557 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| S116 | North Temple 230kV | 912 | Gas | Withdrawn |
| Z2-026 | North Temple 230kV | 800 | Gas | Withdrawn |
| V4-020 | North Temple 230kV | 650 | Gas | Withdrawn |
| H10 | North Temple 230kV | 560 | Gas | Withdrawn |
| X3-006 | North Temple 230kV | 110 | Gas | Withdrawn |
Berks, PA: 63 requests in the PJM queue, 12 active totaling 1,177.6 MW.
A substation with the same name is named in PJM transmission planning materials: North Temple (METED, 8 mentions).
Same name and state (weaker). Matched on name and state: the utility that presented this substation operates in one state, and every queue filing at a substation of the same name is in that state. No transmission owner is recorded on those filings, so this is a weaker match than one on owner. Not verified as the same facility.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 557 |
| MW capacity | 557 |
| MFO | 557 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.