Upton Solar
PJM queue ID AD1-060
Upton Solar (AD1-060) is listed in the PJM interconnection queue as a 5.7 MW solar project in Franklin County, PA. The filing names Mercersburg-Milnor as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of September 1, 2021.
| Queue ID | AD1-060 |
|---|---|
| Project name | Upton Solar |
| Status (as published) | In Service |
| Substation | Mercersburg-Milnor |
| Point of interconnection | Mercersburg-Milnor 34.5 kV |
| County | Franklin |
| State | PA |
| Voltage | 34.5 kV |
| Capacity | 5.7 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2021-09-01 |
| Source dataset | serial |
Same substation and county
Mercersburg-Milnor substation: 4 requests in the PJM queue, 1 active totaling 5.7 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| X3-062 | Mercersburg-Milnor 34.5kV | 7.6 | Solar | Withdrawn |
| X4-011 | Mercersburg-Milnor 34.5kV | 7.6 | Solar | Withdrawn |
| AB1-129 | Mercersburg-Milnor 34.5kV | 5.7 | Solar | Withdrawn |
Franklin, PA: 80 requests in the PJM queue, 20 active totaling 384.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 15 |
| MW capacity | 5.7 |
| MFO | 15 |
Fields shown are those promoted into this dataset. The original ISO filing may contain further columns (study reports, agreement dates, milestone flags) that are retained in the pipeline but not all surfaced here. Always confirm against the ISO's published queue before relying on any value.