Great Cove Solar II
PJM queue ID AE1-101
Great Cove Solar II (AE1-101) is listed in the PJM interconnection queue as a 100.5 MW solar project in Franklin County, PA. The filing names McConnellsburg-Texas Eastern as its point of interconnection. PJM lists its status as “In Service”, with a target commercial operation date of March 31, 2024.
| Queue ID | AE1-101 |
|---|---|
| Project name | Great Cove Solar II |
| Status (as published) | In Service |
| Substation | McConnellsburg-Texas Eastern |
| Point of interconnection | McConnellsburg-Texas Eastern 138 kV |
| County | Franklin |
| State | PA |
| Voltage | 138 kV |
| Capacity | 100.5 MW |
| Resource (as published) | Solar |
| Resource category | Solar (normalized for filtering) |
| Target commercial operation | 2024-03-31 |
| Source dataset | serial |
Same substation and county
McConnellsburg-Texas Eastern substation: 3 requests in the PJM queue, 1 active totaling 100.5 MW.
| Queue ID | Project | MW | Resource | Status |
|---|---|---|---|---|
| AD2-028 | McConnellsburg-Texas Eastern | 76.3 | Hybrid | Withdrawn |
| AI2-298 | McConnellsburg-Texas Eastern 138 kV | 42 | Solar | Withdrawn |
Franklin, PA: 80 requests in the PJM queue, 20 active totaling 384.3 MW.
Tracked changes
No changes to this filing observed since PJM tracking began on August 27, 2026. Full change log →
Additional filed fields
| Project type | Generation Interconnection |
|---|---|
| MW energy | 150 |
| MW capacity | 100.5 |
| MFO | 150 |