Thompson substation interconnection queue

1 active project totalling 10.2 MW in the PJM queue, plus 6 with terminal status (shown greyed).

1active projects
10.2active MW
7total filed
Queue IDProjectkVMWResourceStatus
P45A Thompson 115kV 115 24 Wind Withdrawn
AA2-132 Thompson 34.5kV 34.5 19.9 Gas Withdrawn
Q02 Thompson 115kV 115 16 Wind Withdrawn
AF1-139 Thompson 34.5 kV 34.5 12 Solar Withdrawn
V3-042 Thompson 115kV 115 10.9 Wind Withdrawn
AF2-294 Thompson 34.5 kV 34.5 10.2 Solar Suspended
R05 Thompson 115kV 115 10 Wind Withdrawn

Capacity that has left the queue does not automatically become available injection capacity — a withdrawal frees study position. Confirm deliverability with PJM before relying on these figures.