Substation Scout

Lakeville substation interconnection queue

0 active projects totalling 0 MW in the PJM queue, plus 2 with terminal status (shown greyed).

0active projects
0active MW
2total filed
Queue IDProjectkVMWResourceStatus
C01-2208 Lakeville 69 kV 69 150 Battery Withdrawn
AG2-612 Lakeville 12 kV 12 4.3 Hybrid Withdrawn

A request with terminal status left the queue as filed. That is a record of the filing, not evidence of injection capacity at this location. Confirm deliverability with PJM before relying on these figures.